Mass production time -Blister packaging

Apr 28, 2025 Leave a message

The formation of a product include product research development, sample preparation, and packaging. blister packaging is a category in the packaging industry, and it is also a form of packaging that involves a wide range of aspects.

 

Generally, after receiving the customer`s drawing/production requirements, we will arrange to make a gystem mold for proofing. Depending on the complexity of the mold, generally it takes 3-5 working days.

 

After the customer confirms the sample size, material, thickness, quantity, we will arrange the copper mold (if customer have high requirements of the blister packaging ,we will use aluminum mold )according to the order. The total is 7-10 working days, sometimes the production is busy, or the material is difficult to determine, it will extend the time depending on the situation.